The information in this article applies to:

    - Business Communications Manager 2.5


DSP Voice Firmware v.R5wi077


Problem

Problems seen with fax/modem equalization training and divergence 
post-training with some line impairments.


Solution

1)  This release improves fax/modem performance under some line conditions. 
    The following changes have been made:
        a) Equalizer adaptation rate during image training has been 
           increased. It was found that the equalizer wasn't fully 
           adaptiong during the training period.
        b) Equalizer adaptation rate during image transmission has 
           been decreased. This change is to prevent the equalizer 
           from diverging as a result of a few data errors.
        c) Equalizer performance has been improved by rounding 
           instead of truncation of 48 to 24 bit results.
        d) Image transmission reliability has been improved by 
           lowering the error threshold at which a modulation 
           TCF will be rejected. This change causes the fax/modem 
           to be more likely to revert to a lower speed modulation.

SR's RESOLVED

DSP Voice Firmware R5WI077

  Q00203294: ALLIED UNIVERSAL: MIAMI, FL
  Q00319035: TEKFOR: WOOSHER, OH

DSP Voice Firmware R5WI076

  Q00429443:Echo on External call  on PRI Trunks.
  Q00336592:AA/CCR CUT-OFFS IN MIDDLE OF PROMPTS

DSP Voice Firmware R5WI075

  Q00384528:NETWORK DIGITAL: FLUCTUATING VM VOLUME
  Q00322337:ARIZONA GAME & FISH: LOW AUDIO LEVEL ON VM MESSAGES.
  Q00321496:COUNTY OF ALPENA: GREETING VOLUME FLUCTUATION
  Q00250281:NOCO CANADA, ETOBICOKE, ON : LOW VOLUME AT START OF MESSAGE
  Q00146871:AMIS: Volume of received AMIS messages is very low

DSP Voice Firmware R5WI068

  Q00112193: Echo on IP sets
  Q00168178: Echo heard on IP clients at customer site.
  Q00138400: Fax Messaging intermittant receive failure.
  Q00156935: Echo canceller NLP causing muting of speech path.


SOFTWARE COMPONENTS CHANGED

msc1abot.pci
msc1aovl.s
msc1apll.pci
msc1arun.s
pec1_ovl.s
pec1_run.s
pec1boot.pci
pec1pll.pci
pec3_ovl.s
pec3_run.s
pec3boot.pci
pec3pll.pci
tonedefs.dat
upld_ovl.s
upld_run.s


******************
** Installation **
******************


User Preparation
******************

In preparation for the patch you must know the name or IP 
address of the Business Communications Manager, the Unified 
Manager port number and password, and the VNC password.  
The patch files must be located in a shared location on the 
computer the Wizard will be run from and the computer must 
be connected to the same network as the Business 
Communications Manager.  If you received the patch on CD, 
then the CD must be shared. If the patch is in a directory 
elsewhere on your local system, its parent directory must 
be shared. \
 
e.g. You have patch Q00137821.  It contains subdirectories and 
files.  If you have chosen to place Q00137821 on your local 
system in d:\BCMPatches, your local directory structure will 
look like this: 
Root directory of all patches	d:\BCMPatches\
Root directory of TBD	d:\BCMPatches\Q00137821\
Subdirectories of TBD	d:\BCMPatches\Q00137821\patch files\
                        d:\BCMPatches\Q00137821\prepfiles\
                        d:\BCMPatches\Q00137821\server html\
                        d:\BCMPatches\Q00137821\images\   

In this example, the shared directory must be d:\BCMPatches\ and 
the file to start the patch is d:\BCMPatches\Q00137821\index.html.
When accessing the share during the Map stage of the patch, it 
is important to remember that if the username being used is not 
part of the same domain as the Enterprise Edge, the username must 
be preceded with your local computer's name or IP address.  In 
this case, the username must be entered on as hostname\username 
rather than simply username.

 
*********************
** Process Details **
*********************


The current process is broken into html pages. As the patch proceeds 
you are guided through these pages step by step.  At all stages, a 
small frame is present in the lower part of your window.  This frame 
will display all output of the various commands that are sent to the 
server during the patch. 


Connect
*********

To begin the Enterprise Edge patch, the Wizard must know the location 
of your server.  Please enter the IP address or DNS Name and Unified 
Manager port number of the Business Communications Manager being patched.  
When prompted for a userid and password, enter the Unified Manager userid 
and password.  Once entered, a connection will be attempted. If successful, 
the wizard will automatically proceed to the next step.   If the connection 
fails, the Nortel Networks logo will disappear and any error returned from 
the server will appear in the lower frame.  In the case of a failure, please 
verify the Business Communications Manager's address and that you are using 
the correct userid and password.

 
Map Patch Share 
*****************

The second step in the patch process is to tell the Wizard where to find 
the patch files.   The share name is that of the root directory on your 
local computer where the patch is located.  This directory must be shared 
for remote file access.  If the patch is located in d:\BCMPatches\Q00137821\, 
then d:\BCMPatches\ must be shared.  Please enter the share name, username, 
and password required to connect to the share.  It is important to remember 
that if the username being used is not part of the same domain as the 
Business Communications Manager, the username must be preceded with your local 
computer's name or IP address.  In this case, the username must be entered 
on as hostname\username rather than simply username.

Once completed, you will see "The operation completed successfully." in the 
lower frame.  At this point press Next to continue to the server preparation 
stage of the patch.  If you see an error message, please verify the share 
information and access credentials and try again.   (If you have previously 
completed this step and are redoing it without having performed the Prepare 
stage or restarted the Edge, you will see an error indicating the device name 
is already in use. This is because you've already performed this step and the 
drive is not disconnected until a reboot.  You can click Next and continue.) 


Prepare Server
****************

Step three makes some changes to the server to prepare it for the patch.  These 
changes consist of copying the patch files, reconfiguring the Apache web server, 
and unmounting the patch share.  This step requires no user input, simply an 
acknowledgement that it is going to happen.

This step takes thirty seconds.  The wizard will wait for the web server on the 
Business Communications Manager to restart and verify the connection.  While 
waiting a countdown is displayed.  Once the connection has been verified, the 
wizard will automatically proceed to the next step in the patch process.

You should also open VNC viewer at this stage as it is required for monitoring 
the progress of the remaining steps.


Apply Patch
*************

This step of the Business Communications Manager patch process is specific to 
each patch.   This is when the patch is actually applied and may involve stopping 
and restarting processes on the server and possibly a reboot. 

The Business Communications Manager desktop must be monitored using VNC during 
these steps.  The update progress is displayed in the lower frame, however due 
to the nature of replacing the running components, your browser may appear inactive 
for long periods of time, and possibly timeout.   While replacing and updating running 
components it is also possible that something may fail causing the Business 
Communications Manager to open a dialog box on the server.  While the patch was 
designed to be as robust and automated as possible, there remains a possible 
error scenario.  Without VNC, you will not be able to detect and respond to this 
type of situation should it occur. 

To execute the update component steps, please follow this process: 

1.  Click the "Apply Patch Now" button. Use VNC to monitor the patch progress and 
activity. Progress is also reported back in the bottom frame, which you will need 
to scroll down to follow. If a subcomponent fails to be installed or patched, a 
dialog box will launched from the wizard. You will be forced to restart the 
Business Communications Manager and re-apply the Patch. If this occurs repeatedly, 
please call for technical assistance.

2.  Once the patch completes, the logfile for the patch will be automatically loaded 
inside a new web browser or text window.   Scan this logfile and the monitor frame 
at the bottom of the browser for any anomalies.  The last line should contain the 
words "Application of patch ... completed".

3.  Click on Finished button.

4.  Close the VNC window.


UnMap Patch Share 
*****************

This Fifth step in the patch process occurs only when the patch being run does not 
require a reboot to complete. 

When this step arrears simply click the "Unmap Patch" button to complete the patch 
operation.


Patch Complete
****************

The patch is now complete. The logfile for the patch will be automatically loaded 
inside a new web browser or text window. Please review the logfile for any anomalies. 
Also, launch VNC viewer, and log into the Business Communications Manager to check 
for any error dialog boxes, or critical system events. 